Emory Land & Ranch · Emory Legacy Properties, LLC
CENTRAL TEXAS TEXAS PLACE GUIDE

Land near Manor.

Travis County · location-specific records and acreage research.

Ask about this area ↗
Map data · U.S. Census Bureau TIGERweb ↗Illustrative AI-generated ranch imagery; not filmed in Manor and not a specific listing
City guide · Central Texas

Land research near Manor.

Manor is an incorporated city in the Central Texas research area. The Census Bureau place reference point is in Travis County. Some municipal limits or nearby parcels may cross county lines, so confirm the parcel location before using county records.

Land questions can change with the county, intended use, terrain, water source, access and service providers. Confirm the parcel’s records and current coverage with the team.

County at place centroidTravis County
Incorporated area9.80 sq. mi.
2025 population estimate23,070U.S. Census Bureau source ↗

The county and area figures come from Census geography. A city centroid is not a parcel boundary, service-area guarantee or property description.

Ask whether the team can help near Manor ↗
Census-based location map for Manor, Travis County, Central Texas
Place location reference based on U.S. Census TIGERweb geography. The illustrative rural Texas footage was not filmed in Manor.
Verified locality research

Manor-area acreage: verify City limits and ETJ, platting review, utility provider/capacity, impact-fee assumptions, septic and floodplain jurisdiction

For acreage around Manor, the first feasibility question is where the parcel sits: inside Manor city limits, in the City's ETJ, or in unincorporated Travis County. The City publishes separate city/ETJ maps and GIS files. Its subdivision process applies in both the city limits and ETJ; Manor says ETJ plats also receive concurrent Travis County review. The required path depends on the tract, resulting lot sizes, public infrastructure and proposed work.

Do not treat the phrase “ETJ” or “no zoning” as a blanket permission to build. Manor says it does not regulate property use in the ETJ and that Travis County issues permits there, while platting, county permits, recorded restrictions, floodplain rules, access and utility-provider requirements may still affect a project. Get the responsible offices to confirm the exact jurisdiction and application path before buying or dividing land.

Manor's Maps & Exhibits page provides city/ETJ boundaries and utility layers for water providers, water lines, wastewater lines and treatment facilities. The posted water and wastewater system maps are dated 2023, so use them to frame questions, not to promise service or capacity. Request written provider confirmation of service boundary, nearest main, capacity, line-extension work, connection fees and timing for the parcel.

If septic may be needed, Manor links Travis County's OSSF permit process and says it applies to in-city and ETJ properties. The County's site-plan checklist calls for items such as nearby wells and systems, water lines, easements, steep slopes, floodplain and proposed system location. The City's posted impact-fee sheet says it is for plats from July 5, 2023 onward and cites Ordinance 710 effective that date; confirm current fees, meter size and tract-specific charges directly before underwriting. For flood review, Travis County says its floodplain jurisdiction is outside city limits and directs in-city applicants to local officials.

Use the parcel's legal description, survey, account number and coordinates when contacting Manor, Travis County and each named utility provider. A map or city-name search is not a boundary determination. The Rural Land Feasibility Planner can organize provider quotes and unknown costs without filling gaps with guessed local prices.

Facts to help plan the next check

  • Manor's subdivision page says division of property within city limits and the ETJ requires its subdivision process; the required application depends on the number of lots, infrastructure and how the lots are created.
  • The City says it requires a subdivision submittal if any resulting parcel is five acres or less or a lot will receive a development permit
  • ETJ subdivisions receive concurrent Travis County review, and Travis County ESD 12 review may also be needed.
  • Manor's zoning page says the City does not regulate property use in its ETJ and that Travis County issues permits there; an ETJ location does not establish a use entitlement or remove plat, County permit or deed-restriction checks.
  • The City's Maps & Exhibits page provides a city/ETJ map and GIS shapefile and describes downloadable layers for parcels, jurisdiction, creeks, floodplains, water lines, water providers, wastewater lines and treatment facilities.
  • The City labels its posted water-distribution, wastewater-collection and capital-improvement maps as 2023 products, so these are screening references; confirm current provider, line location, capacity and extension requirements with the provider.
  • The City-hosted impact-fee sheet labels itself for plats dated July 5, 2023 or later and states Ordinance 710 took effect that date; it lists water and wastewater impact fees and taps, but buyers should confirm current applicability, meter assumptions and total charges with the City.
  • Manor Development Services links to Travis County septic permitting and specifically labels it as applying to both in-city and ETJ properties.
  • Travis County's OSSF application instructions request a site plan showing nearby wells and OSSF, potable water lines, easements, slopes of 15% or greater, floodplain and proposed system components.
  • Travis County says its floodplain jurisdiction is in unincorporated areas outside city limits; for property inside a city it directs applicants to the local officials.

Parcel-specific next checks

  1. Collect the legal description, survey, appraisal account number and coordinates; confirm the parcel county and whether each part is inside Manor city limits, Manor ETJ or unincorporated Travis County.
  2. Compare the parcel against Manor's current city/ETJ map or GIS and ask City staff and Travis County to confirm jurisdiction in writing.
  3. Ask Manor which subdivision application applies based on the proposed division, resulting lot sizes, public infrastructure and development permit; if in the ETJ, confirm the concurrent Travis County review and any ESD 12 review.
  4. Use the City's 2023 water and wastewater maps only as screening, then obtain written confirmation from every named provider of service area, line location, capacity, extensions, costs, meter assumptions and timing.
  5. If a private OSSF may be needed, follow Manor's link to Travis County and have a qualified site evaluator confirm soil and system feasibility; include wells, water lines, easements, steep slopes, floodplain and system location on the site plan.
  6. Check the exact floodplain administrator based on city-limit status and obtain current parcel-specific map/determination; distinguish a screening layer from permit authority.
  7. Request the current City fee schedule and a written tract-specific estimate; compare plat-date rules, meter size, connection/tap charges, impact fees and any extension or infrastructure costs.
  8. Review recorded plats, easements, deed restrictions and title documents and obtain qualified survey, engineering, septic and utility review before relying on a concept plan.

Sources

Research checked 2026-11-08. Confirm current details for the exact parcel.

Open the related land tool ↗

Start with the right public records

For a parcel near Manor.

First identify the county for the actual parcel. Then verify title, survey, access, water, flood, soil, utilities and intended-use details with the responsible office or qualified professional.

Place geography: U.S. Census Bureau TIGERweb ↗. Population estimate: 2025 Census Bureau city and town estimates ↗.

Have a parcel in mind?

Start with its county
and your plans.

Share the location and what you hope to do there. The West Pole team can confirm current coverage and the next useful step.

Ask about Manor ↗
Clear answers · Texas land

Common questions.

Can I split land in Manor's ETJ?

Manor says its subdivision process applies inside both city limits and the ETJ. The application depends on lot count, infrastructure and how the division is structured; the City says a subdivision submittal is required if any resulting parcel is five acres or less or a development permit will be filed, and ETJ plats receive concurrent Travis County review. Ask both offices to confirm the exact process for the legal description before marketing or purchasing divided lots.

Does land in Manor's ETJ have no restrictions because it is outside the city?

No. Manor says it does not regulate property use in its ETJ and that Travis County issues permits there. Subdivision review, County requirements, floodplain and septic rules, utility approvals, recorded restrictions and access conditions can still matter. Confirm each with the responsible office for the specific parcel and proposed work.

Can Manor water or sewer serve my acreage?

The City publishes 2023 water and wastewater maps and GIS layers showing utility information, but a mapped line does not confirm a connection or available capacity. Contact the listed provider with the parcel address and legal description to request a written serviceability, capacity, extension, meter and cost determination.

Does Travis County handle septic permits for Manor properties?

Manor's Development Services page links Travis County septic permits and labels them as applying to both in-city and ETJ properties. Travis County's application asks for site-specific information such as distance to sewer, wells, water lines, easements, steep slopes and floodplain. Verify the current process and parcel jurisdiction with Manor and Travis County.

Are the posted Manor water and wastewater fees current for every tract?

The City-hosted fee sheet is labeled for plats dated July 5, 2023 or later and cites Ordinance 710 effective that date. It contains meter-size and impact-fee assumptions. Have the City confirm the current fee schedule, applicability by plat and project date, meter size, tap costs, line extensions and any other parcel-specific charges before budgeting.